Case Study - Lifting of Sub-sea Hang-off

Case Study - Lifting of Sub-sea Hang-off
Equalizer MG7TM as suggested for the sub-sea hang-off project

Equalizer International was approached to suggest appropriate tooling for a difficult flange spreading scenario. While inspecting and servicing hang‐off connectors on the chain‐deck of an ageing FPSO vessel, many were found to lack the nylon spacer rings which should maintain a flange access gap. As a result the hang‐off units had dropped so that the flanges were face‐to‐face, and heavily corroded together.

To find our more about this Case Study click here or view in our Technical Library.